ODM Supply Partnership

New Tooling, Exclusive to Your Brand

New molds engineered to your design, tooling rights transferred to you. From MOQ 3,000 pcs, 30-45 working days, NDA first.

How an ODM Build Moves

Eight steps from NDA to container.

  1. 1

    Brief under NDA

    Send the concept; an NDA is signed before any engineering work starts.

  2. 2

    Scope the design

    Target price, structure and features are mapped to a feasible spec with the partner factory.

  3. 3

    Engineer the tooling

    New molds are opened for your project alone; tooling rights transfer to you.

  4. 4

    Approve T1 samples

    Trial samples from the new tooling go to you for sign-off.

  5. 5

    Freeze and file

    Design is locked; compliance documentation is compiled with the supplying factory.

  6. 6

    Run production

    Mass production with a 3,000 pcs MOQ, 30-45 working days including tooling and trial samples.

  7. 7

    Pack retail-ready

    Exclusive packaging and cartons are built to your line's identity.

  8. 8

    Ship and support

    FOB Shenzhen, EXW or DDP; the desk stays your contact after launch.

ODM at a Glance

3,000pcs
ODM MOQ
30-45working days
ODM lead time, tooling included
24h
Desk reply time
6lines
Catalog lines ready to label

What an ODM Project Covers

Exclusive Tooling

New molds open for your project alone; tooling rights transfer to you. The design is never resold.

Packaging & Artwork

Your brand on boxes, inserts and manuals. Send dielines or brief us; artwork is agreed before production.

App & Brand Naming

The companion app can carry your product names, not ours — app naming is part of every order.

Documentation Support

CE, RoHS, FCC and UKCA files compiled with the supplying factory. Certification support is included per project.

What ODM Buyers Gain

Exclusive by contract

New tooling opens for your project alone; the design is never resold to another buyer.

Rights transfer to you

Design and tooling rights move to you under the ODM agreement.

NDA before engineering

Concepts stay confidential; the NDA is signed before any design work starts.

A tier that fits

ODM starts at 3,000 pcs; catalog private label at 1,000 if you want a smaller step.

Timeline in writing

30-45 working days from concept to mass production, tooling and trial samples included.

Documents with the goods

CE, RoHS, FCC or UKCA files are compiled with the supplying factory, per project.

Two Routes to a Branded Line

One team, two ways to build your line.

  OEM ODM
The route Your label, our model Your design, new molds
Tooling Existing molds, no fee New, exclusive to you
Design rights Stays with supplier Transferred to you
MOQ From 1,000 pcs From 3,000 pcs
Lead time 15-25 working days 30-45 working days

The ODM Route in Plain Terms

ODM here means new tooling. The partner factory engineers and opens molds exclusively for your design, and the tooling rights are transferred to you under the ODM agreement. The finished product belongs to your line alone — it is not resold to any other buyer.

What is included: a signed NDA before any engineering starts, structure and tooling work with the partner factory, T1 trial samples for your approval, and mass production on your dedicated molds. App naming and packaging follow your brand list, and CE, RoHS, FCC or UKCA documentation is compiled with the supplying factory.

Terms: projects start at 3,000 pcs and run 30-45 working days from concept to mass production, tooling and trial samples included. Want a smaller first step? Catalog private label starts at 1,000 pcs. Freight moves FOB Shenzhen, EXW or DDP, and the desk answers within 24 hours at every stage.

Platforms Worth Customizing

Start from a proven platform, then change the shell, features and app naming.

Pet Water Fountains

View all

Automatic Pet Feeders

View all

Pet Grooming Tools

View all

Self-Cleaning Cat Litter Boxes

View all

Interactive Pet Toys

View all

Dog Training Collars

View all

FAQs

What does ODM mean at this desk?

New tooling built to your design. The molds open exclusively for your project and the tooling rights transfer to you. Nobody else gets the product.

How long does an ODM project take?

Thirty to forty-five working days from concept to mass production, including tooling engineering, trial samples and the production run.

Who owns the design and the tooling?

You do. Design and tooling rights are transferred under the ODM agreement, and an NDA is signed before engineering begins.

One Desk, Both Routes

Send a product link, a photo or a napkin sketch. Tell us the quantity and the market. The desk replies within 24 hours with next steps, pricing direction and the MOQ tier that fits.